MIL-DTL-52872D
kits when furnished separately shall operate as specified herein without
maintenance.
4.4.2.2.
Test schedule.
TABLE II.
Test schedule for complete UMS.
First
Quality
Requirement
Test
article
conformance
Test
Paragraph
Paragraph
Individual Sample
1
2
3
4
5
6
Functional:
X
X
-
(a) Power
3.5.2.1
4.4.2.4.1
X
X
-
(b) Performance
3.5.2.2
4.4.2.4.2
X
-
X
(c) Detailed
3.5.2.3
4.4.2.4.3
circuit
X
-
X
(d) Tamper
3.5.2.4
4.4.2.4.4
switch tolerance
X 1/
-
X
Low temperature
3.4.1
(a),
4.4.2.5.1
3.4.2
(a)
X 1/
-
X
High temperature
3.4.1
(a),
4.4.2.5.2
3.4.2
(a)
X 1/
-
X
Humidity
3.4.1
(b),
4.4.2.5.3
3.4.2
(b)
X 1/
-
-
Shock
3.4.2
(c)
4.4.2.5.4
X 1/
-
-
Electromagnetic
3.6
4.4.2.6
susceptibility
X 2/
-
-
Reliability
3.7
4.4.2.7
1/
Reliability test units not subjected to this test.
Environmental test units not subjected to this test.
2/
TABLE III.
Test schedule for transceiver and transceiver CCA.
First
Quality
Test 1/
Requirement
Test
article
Conformance
Paragraph
Paragraph
Individual Sample
1
2
3
4
5
6
X
X
-
Functional
3.5.2.5
4.4.2.4.5
X
-
X
Tamper switch
3.5.2.4
4.4.2.4.4
tolerance 2/
X
-
X
Low Temperature
3.4.1
(a),
4.4.2.5.1
3.4.2
(a)
X
-
X
High Temperature
3.4.1
(a),
4.4.2.5.2
3.4.2
(a)
X
-
X
Humidity
3.4.1
(b),
4.4.2.5.3
3.4.2
(b)
X
-
-
Shock 2/
3.4.2
(c)
4.4.2.5.4
1/
The transceiver CCA may be placed in a transceiver enclosure or
equivalent to simulate normal environment.
2/
Required for transceiver only.
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business